Do I Need a Permit for My Deck? Your Colorado Guide

AGC Editorial Team 6 min read Sep 14, 2024
Contractor reviewing building plans

The most common question we get from homeowners who've tried to DIY a deck before: 'Do I need a permit?' The short answer: almost certainly yes. The more useful answer is that permit requirements in the South Denver metro area depend on your specific municipality — and getting this wrong can lead to a forced tear-down.

General Rule: Above 30 Inches = Permit Required

Across most Colorado jurisdictions, a deck that is 30 inches or more above grade (ground level) requires a building permit. Even ground-level decks often require a permit if they exceed 200 square feet or are attached to the house. Detached, ground-level platforms under 200 sq ft are sometimes exempt — but this varies city by city.

City-by-City Breakdown for South Denver

City / CountyPermit ThresholdTypical TurnaroundNotes
Denver (City)Any attached deck or >200 sq ft3–6 weeksOnline portal available
Highlands Ranch (Douglas Co.)>30" above grade or >120 sq ft2–4 weeksHOA approval also required
LittletonAny deck >30" or attached2–5 weeksFee based on project value
Englewood>30" above grade3–5 weeksRequires stamped drawings
CentennialAny deck >30" or >200 sq ft4–8 weeksArapahoe County jurisdiction
ParkerAny attached deck3–6 weeksDouglas County rules apply

What Happens If You Skip the Permit?

Unpermitted decks create real problems. When you sell your home, the buyer's inspector will flag it — and you'll be required to either pull the permit retroactively (which means opening up the deck for inspection) or tear it down. Title companies and mortgage lenders take unpermitted structures seriously.

There's also liability exposure: if someone is injured on an unpermitted deck, your homeowner's insurance may deny the claim on the grounds that the structure was built out of code.

AGC Handles Every Permit

We manage the full permit process on every job — application, fee payment, scheduling inspections, and final sign-off. You never deal with the city. It's included in our project price.

HOA Approval: A Separate Step

In Highlands Ranch, Lone Tree, Parker, and many Centennial communities, you'll also need HOA approval before any permit is issued. We provide all documentation your HOA requires: site plan, elevation drawings, material specifications, and color swatches. We've navigated hundreds of HOA approval processes and know exactly what each association needs to see.

A

AGC Editorial Team

15+ years of deck building experience in South Denver